MMPK “BRONKA” – VYBORG DISTRICT, BOLSHOY BOR, TEMPORARY BERTH IN DALNAYA BAY
Tugboat:
Barge – platform “Silver – 3005”
Tug – pusher “Mars”
Cargo:
- Heavy carbohydrate removal column 22Т01 HCC RC (1pc): length 28.50 m , width 4.7 m, height 4.7 m, total weight 180.0 tons.
- Refrigerant inlet separator 4 1D11 CCSD (2pcs): length 19 m, width 5.6 m, height 5, 25 m, total weight 196.0 tons.
- Refrigerant separator 1 stage compressor 4 1D12 CCID (2pcs): length 12.50 m, width 5.40 m, height 5.80 m, total weight 150 , 0 tons.
- Refrigerant separator 2 stages of compressor 4 1D13 CCHCS (2pcs): length 12.50 m, shi ina 5.40 m, height 5.80 m, total weight 120.0 tons.
Loading method: crane.
Method unloading: RO-RO.
In May 2018, VIKAR started a project to transport heavy equipment from the berth of the MMRP “Bronka” to a temporary pier in Dalnyaya Bay, Bolshoy Bor, Vyborg district.