The project of transportation of reactor vessels along the route St. Petersburg – Sosnovy Bor

Tug and barge line-up:
Barge – platform “Silver – 3005”
Tug – pusher “Multikat 158”, “Bogatyr”, “Raid-50”

Cargo:
The reactor vessel.

Dimensions:
– length 11420 mm;
– width is 5600 mm;
– height is 5470 mm.
– weight is 340.1 tons.

Loading method: RO-RO.
Unloading method: RO-RO.

In November 2017, VIKAR completed the project of transporting heavy equipment from the berth of OMZ on the Neva River, St. Petersburg Settlement . Ust – Slavyanka to Sosnovy Bor, Koporskaya Bay, LNPP berth – 2.

To carry out this project, our company provided the barge with the Silver-3005 platform. The project of transportation of oversized equipment on a ro-ro barge was developed by our company’s specialists. The cargo was fastened on the vessel according to the loading, placement and fastening schemes. Loading and unloading are performed by ro-ro.

Transportation of heavy oversized cargo has its own characteristics, it is a more complicated process of loading and unloading, installation and fastening of oversized cargo on a barge, selection of the necessary barge-towing structure, development of design documentation, obtaining permits for the transportation of oversized cargo, searching for a suitable place of unloading, building a temporary berth.

Thus, in accordance with all the components of successful work, this transportation was completed within a specified period , Observing all the conditions of the contract with the customer.