PROJECT OF TRANSPORTATION OF OVERSIZED EQUIPMENT VOLZHSKY SETTLEMENT – TOLYATTI SETTLEMENT
Barge-tow train:
Pusher tugboat “Hero Igor Aseev” project 81200, class RS – M-PR2,5(LED30)A
Barge-pad “Morvenna-2002” PC class – RINA, HULL; PONTOON; CASPIAN SEA
Cargo:
The right wing of the lock No. 21, quantity – 1 piece, weight — 217.3tons Dimensions – 22122mmx17708mmx2601mm;
The left wing of the lock No. 21, quantity – 1 piece, weight — 217.3tons Dimensions – 22122mmx17708mmx2601mm;
The right wing of the gateway No. 24, quantity – 1 piece, weight -249.7tons Dimensions – 24822mmx17708mmx2601mm;
The left wing of the lock No. 24, quantity – 1 piece, weight — 249.7 tons Dimensions – 24822mmx17708mmx2601mm;
Metal structures, quantity – 3 pieces, weight — 29.7tons
At the beginning of May 2023, our company performed river transportation of sluice gates along the route: Volzhsky settlement – Tolyatti settlement. During the passage of the Balakovo and Tolyatti locks with cargo protruding beyond the dimensions of the barge, auxiliary tugs were involved.
The customer of the transportation is LLC “Special Welded Metal Structures”.